hydra-queue-runner: Improved scheduling

Each jobset now has a "scheduling share" that determines how much of the build farm's time it is entitled to. For instance, if a jobset has 100 shares and the total number of shares of all jobsets is 1000, it's entitled to 10% of the build farm's time. When there is a free build slot for a given system type, the queue runner will select the jobset that is furthest below its scheduling share over a certain time window (currently, the last day). Withing that jobset, it will pick the build with the highest priority.

So meta.schedulingPriority now only determines the order of builds within a jobset, not between jobsets. This makes it much easier to prioritise one jobset over another (e.g. nixpkgs:trunk over nixpkgs:stdenv).

Created by  Eelco Dolstra  on September 21, 2013
GEADFVZ5LXXFIE3VIP4UJ4AEI2VX57DXER47JA4IHH5BG3QNPAEAC
Dependencies
In channels
upstream
main
Change contents